Coffey Engineering Group Contributing to the future of Sydney’s Infrastructure

In a collaborative effort with Aquatic Engineering, Coffey Maintenances has manufactured and supplied 15 water silos ranging from 50 square cubic metres to 120 square cubic metres.

The project also required the manufacturing of 12 T6 separator units along with a variety of access platforms and walkways to be used across a variety of sites across Sydney.

Upload Resume Form